Adelanto Solar II, LLC
A 7 MW solar power plant in San Bernardino, California, owned by Adelanto Solar II, LLC, commissioned in 2015.
Facility nameplate · EIA Plant ID 59440Solar
Nameplate capacity
7 MW
Primary fuel
Solar
Commissioned
2015
Owner
Adelanto Solar II, LLC
Location
San Bernardino, California
Coordinates
Generation (2024)
14.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 10.2 | |
| 2016 | 17.2 | |
| 2017 | 18.6 | |
| 2018 | 18.9 | |
| 2019 | 18.3 | |
| 2020 | 16.4 | |
| 2021 | 17.3 | |
| 2022 | 16.6 | |
| 2023 | 17 | |
| 2024 | 14.4 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Adelanto Solar, LLC | Solar | 20 MW | ~0 km |
| Expressway Solar A | Solar | 2 MW | ~4 km |
| High Desert Power Plant | Natural Gas | 960 MW | ~4 km |
| Expressway Solar B | Solar | 2 MW | ~4 km |
| Expressway Solar C2 | Solar | 1.5 MW | ~4 km |
| Victor Mesa Linda B2 | Solar | 1.5 MW | ~5 km |
See all solar plants in California or browse all plants in California.