Axium Modesto Solar

A 25 MW solar power plant in Stanislaus, California, owned by Axium US Solar Holdings LLC, commissioned in 2012.

Facility nameplate · EIA Plant ID 58039Solar
Nameplate capacity
25 MW
Primary fuel
Solar
Commissioned
2012
Location
Stanislaus, California
Generation (2024)
47.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Axium Modesto Solar

Stanislaus, California · 37.7342, -120.9956

Reported annual generation

YearGWh
201564.3
201664.3
201762.4
201863.9
201961.2
202061.2
202162.3
202262
202353.7
202447.4

Nearby power plants

PlantFuelCapacityDistance
ERock MID Claribel Generation StationNatural Gas48 MW~4 km
Central Valley Ag PowerBiomass1.5 MW~9 km
WoodlandNatural Gas199 MW~9 km
AltaGas Ripon Energy Inc.Natural Gas49.5 MW~11 km
Ripon Generation StationNatural Gas121 MW~11 km
McClureNatural Gas142.4 MW~13 km

See all solar plants in California or browse all plants in California.