BCE Los Alamitos 2
A 20 MW solar power plant in Orange, California, owned by Bright Canyon Energy, commissioned in 2023.
Facility nameplate · EIA Plant ID 66532Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2023
Owner
Bright Canyon Energy
Location
Orange, California
Coordinates
Generation (2023)
3.4 GWh
Other fuels
Storage
Status
Operating
Technology
Batteries
Units
2
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| BCE Los Alamitos 1 | Solar | 20 MW | ~1 km |
| AES ES Alamitos, LLC | Storage | 100 MW | ~5 km |
| AES ES Alamitos 2 LLC | Storage | 82 MW | ~5 km |
| AES Alamitos LLC | Natural Gas | 1.11 GW | ~5 km |
| AES Alamitos Energy Center | Natural Gas | 678 MW | ~5 km |
| Haynes | Natural Gas | 1.74 GW | ~5 km |
See all solar plants in California or browse all plants in California.