Blythe Mesa Solar II
A 335.6 MW solar power plant in Riverside, California, owned by Blythe Mesa Solar II, LLC, commissioned in 2022.
Facility nameplate · EIA Plant ID 65053Solar
Nameplate capacity
335.6 MW
Primary fuel
Solar
Commissioned
2022
Owner
Blythe Mesa Solar II, LLC
Location
Riverside, California
Coordinates
Generation (2024)
552 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2022 | 32.8 | |
| 2023 | 590.2 | |
| 2024 | 552 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Blythe Energy Inc | Natural Gas | 591 MW | ~3 km |
| Solar Blythe 2 | Solar | 20 MW | ~3 km |
| Palo Verde College | Solar | 1.2 MW | ~4 km |
| Blythe Solar III, LLC Hybrid | Solar | 251.8 MW | ~6 km |
| Blythe Solar II, LLC | Solar | 246.2 MW | ~6 km |
| Blythe Solar 110, LLC | Solar | 172.8 MW | ~7 km |
See all solar plants in California or browse all plants in California.