A 50 MW solar power plant in Madera, California, owned by 41MB 8me, LLC, commissioned in 2020.
Facility nameplate · EIA Plant ID 59531Solar
Nameplate capacity
50 MW
Primary fuel
Solar
Commissioned
2020
Time in queue (2011→2020)
9.2 yrs
Owner
41MB 8me, LLC
Location
Madera, California
Coordinates
Generation (2024)
113.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2011, commercial operation 2020 — 9.2 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2020 | 77 | |
| 2021 | 120.4 | |
| 2022 | 117.1 | |
| 2023 | 119.9 | |
| 2024 | 113.9 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Pacific Ethanol Madera Solar Array | Solar | 4.3 MW | ~3 km |
| Madera Community Hospital | Solar | 1 MW | ~8 km |
| CA - Madera USD - Madera South HS | Solar | 1.2 MW | ~8 km |
| Sealed Air Madera Solar Project | Solar | 3.8 MW | ~9 km |
| KDC Solar Madera LLC | Solar | 10 MW | ~13 km |
| Site 980 65 | Hydroelectric | 2.1 MW | ~14 km |