CA Manteca 730 Spreckels Ave

A 3 MW solar power plant in San Joaquin, California, owned by Catalyze Manteca 730 Spreckels Avenue Microgrid LLC, commissioned in 2024.

Facility nameplate · EIA Plant ID 66509Solar
Nameplate capacity
3 MW
Primary fuel
Solar
Commissioned
2024
Owner
Catalyze Manteca 730 Spreckels Avenue Microgrid LLC
Location
San Joaquin, California
Generation (2024)
0.3 GWh
Other fuels
Storage
Status
Operating
Technology
Batteries
Units
2

Nearby power plants

PlantFuelCapacityDistance
Manteca Land PVSolar1 MW~6 km
AltaGas Ripon Energy Inc.Natural Gas49.5 MW~9 km
Ripon Generation StationNatural Gas121 MW~9 km
Ameresco ForwardWaste4.4 MW~11 km
Niagara Bottling StocktonSolar1 MW~13 km
Donaghy-StocktonSolar1.1 MW~13 km

See all solar plants in California or browse all plants in California.