A 150 MW wind power plant in McDonough, Illinois, owned by Cardinal Point LLC, commissioned in 2020.

Facility nameplate · EIA Plant ID 59902Wind
Nameplate capacity
150 MW
Primary fuel
Wind
Commissioned
2020
Time in queue (20152019)
4.5 yrs
Owner
Cardinal Point LLC
Location
McDonough, Illinois
Generation (2024)
535.1 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1

This facility was matched to a MISO interconnection request (LBNL Queued Up): queued 2015, commercial operation 2019 4.5 years in the queue. See the MISO queue or typical durations.

Reported annual generation

YearGWh
2020431
2021580.7
2022619.7
2023544
2024535.1

Nearby power plants

PlantFuelCapacityDistance
McDonough Solar 1, LLC CSGSolar4 MW~9 km
Macomb 2ASolar2 MW~16 km
Sullivan B Community Solar LLCSolar2 MW~16 km
BushnellOil10.8 MW~21 km
Earp Solar, LLCSolar35 MW~34 km
Burlington (IA)Natural Gas290.8 MW~35 km