Cavalier Solar A2

A 84.4 MW solar power plant in Isle of Wight, Virginia, owned by AES Clean Energy, commissioned in 2024.

Facility nameplate · EIA Plant ID 67421Solar
Nameplate capacity
84.4 MW
Primary fuel
Solar
Commissioned
2024
Location
Isle of Wight, Virginia
Coordinates
Generation (2024)
7.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Cavalier Solar A2

Isle of Wight, Virginia · 37.018, -76.7358

Nearby power plants

PlantFuelCapacityDistance
Cavalier SolarSolar155.6 MW~0 km
Solidago SolarSolar20 MW~14 km
Gravel NeckNatural Gas407.7 MW~16 km
SurryNuclear1.70 GW~17 km
Woodland Solar FarmSolar19 MW~18 km
Colonial Trail WestSolar142.4 MW~20 km

See all solar plants in Virginia or browse all plants in Virginia.