Chili Bar

A 8.3 MW hydroelectric power plant in El Dorado, California, owned by Sacramento Municipal Util Dist, commissioned in 1965.

Facility nameplate · EIA Plant ID 225Hydroelectric
Nameplate capacity
8.3 MW
Primary fuel
Hydroelectric
Commissioned
1965
Location
El Dorado, California
Generation (2024)
32.8 GWh
Status
Operating
Technology
Conventional Hydroelectric
Units
1

Location

Map of the United States showing the location of Chili Bar

El Dorado, California · 38.7718, -120.8132

Reported annual generation

YearGWh
20150.9
201632.4
201743.4
201827.2
201935.1
202020.4
20217.2
202225.5
202343.5
202432.8

Nearby power plants

PlantFuelCapacityDistance
White Rock/Slab CreekHydroelectric269.2 MW~2 km
Rock Creek LPHydroelectric3 MW~3 km
El Dorado CountySolar1.5 MW~8 km
El DoradoHydroelectric20 MW~17 km
Deer Creek 2Solar1.3 MW~22 km
CaminoHydroelectric157.8 MW~25 km

See all hydroelectric plants in California or browse all plants in California.