Corcoran Solar

A 20 MW solar power plant in Kings, California, owned by Consolidated Edison Development Inc., commissioned in 2013.

Facility nameplate · EIA Plant ID 58374Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2013
Time in queue (2009→2013)
4.5 yrs
Location
Kings, California
Generation (2024)
34.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2009, commercial operation 2013 — 4.5 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of Corcoran Solar

Kings, California · 36.1383, -119.5733

Reported annual generation

YearGWh
201552.4
201651.2
201750.9
201850.5
201944.7
202049.6
202148.5
202247.1
202334.7
202434.6

Nearby power plants

PlantFuelCapacityDistance
CID Solar (CA)Solar2 MW~1 km
CID Solar, LLCSolar20 MW~1 km
Corcoran Solar 2Solar19.8 MW~1 km
Corcoran Solar 3Solar20 MW~2 km
Cottonwood Solar, LLC (City of Corcoran)Solar12 MW~2 km
CorcoranSolar1.1 MW~4 km