Corcoran Solar
A 20 MW solar power plant in Kings, California, owned by Consolidated Edison Development Inc., commissioned in 2013.
Facility nameplate · EIA Plant ID 58374Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2013
Time in queue (2009→2013)
4.5 yrs
Owner
Consolidated Edison Development Inc.
Location
Kings, California
Coordinates
Generation (2024)
34.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2009, commercial operation 2013 — 4.5 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 52.4 | |
| 2016 | 51.2 | |
| 2017 | 50.9 | |
| 2018 | 50.5 | |
| 2019 | 44.7 | |
| 2020 | 49.6 | |
| 2021 | 48.5 | |
| 2022 | 47.1 | |
| 2023 | 34.7 | |
| 2024 | 34.6 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| CID Solar (CA) | Solar | 2 MW | ~1 km |
| CID Solar, LLC | Solar | 20 MW | ~1 km |
| Corcoran Solar 2 | Solar | 19.8 MW | ~1 km |
| Corcoran Solar 3 | Solar | 20 MW | ~2 km |
| Cottonwood Solar, LLC (City of Corcoran) | Solar | 12 MW | ~2 km |
| Corcoran | Solar | 1.1 MW | ~4 km |