Coronal Lost Hills

A 20 MW solar power plant in Kern, California, owned by Arevon Energy, Inc., commissioned in 2015.

Facility nameplate · EIA Plant ID 59638Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2015
Time in queue (2009→2015)
5.8 yrs
Location
Generation (2024)
37.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2009, commercial operation 2015 — 5.8 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of Coronal Lost Hills

Kern, California · 35.7267, -119.9058

Reported annual generation

YearGWh
201535.3
201652.6
201752.1
201852.6
201950.7
202046.4
202151.3
202247.4
202328.6
202437.4

Nearby power plants

PlantFuelCapacityDistance
Wonderful KingsSolar3.5 MW~6 km
Wonderful Lost HillsSolar17.1 MW~7 km
Morelos del SolSolar15 MW~8 km
Wonderful Orchards - West ValleySolar3 MW~10 km
Lost Hills OilfieldSolar1.9 MW~10 km
Lost Hills/BlackwellSolar32 MW~13 km