Cycz Solar Project CSG Hybrid
A 3.3 MW solar power plant in Worcester, Massachusetts, owned by AES Distributed Energy, commissioned in 2020.
Facility nameplate · EIA Plant ID 63472Solar
Nameplate capacity
3.3 MW
Primary fuel
Solar
Commissioned
2020
Owner
AES Distributed Energy
Location
Worcester, Massachusetts
Coordinates
Generation (2024)
2.9 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2020 | 0.7 | |
| 2021 | 3.4 | |
| 2022 | 3.1 | |
| 2023 | 3.1 | |
| 2024 | 2.9 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Spencer Solar MA | Solar | 2.5 MW | ~3 km |
| Antanavica Solar | Solar | 1 MW | ~4 km |
| Woodchuck Solar, LLC CSG | Solar | 1 MW | ~4 km |
| Blair Wire Village Solar, LLC CSG | Solar | 1 MW | ~5 km |
| East Brookfield Main Street Solar LLC CS | Solar | 1 MW | ~5 km |
| Curtis Hill Solar CSG | Solar | 2 MW | ~5 km |
See all solar plants in Massachusetts or browse all plants in Massachusetts.