Dakota Range III Wind Project

A 153.6 MW wind power plant in Grant, South Dakota, owned by Engie North America, commissioned in 2021.

Facility nameplate · EIA Plant ID 63102Wind
Nameplate capacity
153.6 MW
Primary fuel
Wind
Commissioned
2021
Time in queue (20152020)
4.6 yrs
Owner
Engie North America
Location
Coordinates
Generation (2024)
494.8 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1

This facility was matched to a MISO interconnection request (LBNL Queued Up): queued 2015, commercial operation 2020 4.6 years in the queue. See the MISO queue or typical durations.

Reported annual generation

YearGWh
2021295
2022522.9
2023517.7
2024494.8

Nearby power plants

PlantFuelCapacityDistance
Dakota Range WindWind304 MW~8 km
Crowned Ridge Wind Energy CenterWind200.1 MW~24 km
Crowned Ridge Wind II Energy CenterWind200.6 MW~32 km
Valley Queen CheeseOil4.5 MW~37 km
State Auto InsuranceOil1.7 MW~38 km
Watertown Power PlantOil67.5 MW~41 km

See all wind plants in South Dakota or browse all plants in South Dakota.