Don A Campbell 2 Geothermal
A 20 MW geothermal power plant in Mineral, Nevada, owned by ORNI 37 LLC, commissioned in 2015.
Facility nameplate · EIA Plant ID 60419Geothermal
Nameplate capacity
20 MW
Primary fuel
Geothermal
Commissioned
2015
Owner
ORNI 37 LLC
Location
Mineral, Nevada
Coordinates
Generation (2024)
93.5 GWh
Status
Operating
Technology
Geothermal
Units
1
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 59.2 | |
| 2016 | 175 | |
| 2017 | 172.9 | |
| 2018 | 158.9 | |
| 2019 | 130.7 | |
| 2020 | 122.6 | |
| 2021 | 113.5 | |
| 2022 | 104 | |
| 2023 | 99.5 | |
| 2024 | 93.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Don A Campbell 1 Geothermal | Geothermal | 20 MW | ~0 km |
| Luning Energy | Solar | 50 MW | ~34 km |
| Salt Wells | Geothermal | 23.6 MW | ~55 km |
| Fort Churchill | Natural Gas | 230 MW | ~77 km |
| Ft. Churchill PV | Solar | 19.9 MW | ~78 km |
| Stillwater Solar PV II | Solar | 20 MW | ~81 km |
See all geothermal plants in Nevada or browse all plants in Nevada.