Franklin Solar Hybrid

A 100 MW solar power plant in Twin Falls, Idaho, owned by Franklin Solar Idaho, commissioned in 2024.

Facility nameplate · EIA Plant ID 67190Solar
Nameplate capacity
100 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2019→2024)
5.2 yrs
Owner
Franklin Solar Idaho
Location
Twin Falls, Idaho
Generation (2024)
127 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO West interconnection request (LBNL Queued Up): queued 2019, commercial operation 2024 — 5.2 years in the queue. See the West queue or typical durations.

Location

Map of the United States showing the location of Franklin Solar Hybrid

Twin Falls, Idaho · 42.2042, -114.6099

Nearby power plants

PlantFuelCapacityDistance
Jackpot Solar, LLCSolar120 MW~2 km
Low Line RapidsHydroelectric2.8 MW~36 km
Amalgamated Sugar Twin FallsNatural Gas10.2 MW~39 km
South Forks HydroHydroelectric8 MW~40 km
Clif Bar Bakery of Twin FallsSolar1.6 MW~41 km
Rock Creek IIHydroelectric1.9 MW~47 km

See all solar plants in Idaho or browse all plants in Idaho.