Fresno Sunnyside High School Hybrid

A 1.8 MW solar power plant in Fresno, California, owned by Forefront Power, LLC, commissioned in 2020.

Facility nameplate · EIA Plant ID 63422Solar
Nameplate capacity
1.8 MW
Primary fuel
Solar
Commissioned
2020
Location
Fresno, California
Generation (2024)
2.5 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2

Location

Map of the United States showing the location of Fresno Sunnyside High School Hybrid

Fresno, California · 36.734, -119.7178

Reported annual generation

YearGWh
20200.3
20212.5
20222.5
20232.5
20242.5

Nearby power plants

PlantFuelCapacityDistance
JD Foods - JD FoodsSolar1.5 MW~4 km
Vitro Flat Glass LLCOil3.3 MW~5 km
Rio Bravo FresnoBiomass28 MW~5 km
OK Produce Fresno CarportSolar2 MW~5 km
Malaga Power LLCNatural Gas121 MW~5 km
Gap Pacific Distribution CenterSolar2.4 MW~5 km

See all solar plants in California or browse all plants in California.