GCC Trident Solar Project
A 2 MW solar power plant in Gallatin, Montana, owned by GCC Trident LLC, commissioned in 2022.
Facility nameplate · EIA Plant ID 68260Solar
Nameplate capacity
2 MW
Primary fuel
Solar
Commissioned
2022
Owner
GCC Trident LLC
Location
Gallatin, Montana
Coordinates
Generation (2024)
3.7 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Broadwater Power Project | Hydroelectric | 9.7 MW | ~21 km |
| Madison Dam | Hydroelectric | 16.4 MW | ~52 km |
| Basin Creek Plant | Natural Gas | 54.9 MW | ~81 km |
| Canyon Ferry | Hydroelectric | 55 MW | ~82 km |
| Green Meadow Solar, LLC | Solar | 3 MW | ~96 km |
| Hauser | Hydroelectric | 16.3 MW | ~98 km |
See all solar plants in Montana or browse all plants in Montana.