Jicarilla Solar 2

A 50 MW solar power plant in Rio Arriba, New Mexico, owned by Repsol Renewables NA, commissioned in 2023.

Facility nameplate · EIA Plant ID 65103Solar
Nameplate capacity
50 MW
Primary fuel
Solar
Commissioned
2023
Location
Rio Arriba, New Mexico
Generation (2024)
118.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Jicarilla Solar 2

Rio Arriba, New Mexico · 36.1411, -107.1712

Reported annual generation

YearGWh
2022108.6
2023132.5
2024118.6

Nearby power plants

PlantFuelCapacityDistance
Jicarilla Solar 1 LLCSolar70 MW~22 km
Cuba 2.5ac, LLCSolar2.5 MW~24 km
Arroyo Solar Energy Storage HybridSolar450 MW~40 km
El Vado DamHydroelectric8 MW~64 km
Abiquiu DamHydroelectric15.6 MW~68 km
Los Alamos PV SiteSolar1 MW~83 km

See all solar plants in New Mexico or browse all plants in New Mexico.