Laurel Wind Farm
A 123.4 MW wind power plant in Marshall, Iowa, owned by MidAmerican Energy Co, commissioned in 2011.
Facility nameplate · EIA Plant ID 57500Wind
Nameplate capacity
123.4 MW
Primary fuel
Wind
Commissioned
2011
Time in queue (2008→2011)
3.5 yrs
Owner
MidAmerican Energy Co
Location
Marshall, Iowa
Coordinates
Generation (2024)
463.1 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1
This facility was matched to a MISO interconnection request (LBNL Queued Up): queued 2008, commercial operation 2011 — 3.5 years in the queue. See the MISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 384.3 | |
| 2016 | 375 | |
| 2017 | 379.7 | |
| 2018 | 334.9 | |
| 2019 | 340.4 | |
| 2020 | 343.3 | |
| 2021 | 360.5 | |
| 2022 | 360.7 | |
| 2023 | 431.3 | |
| 2024 | 463.1 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Marshalltown Generating Station | Natural Gas | 708.8 MW | ~18 km |
| Marshalltown | Natural Gas | 189 MW | ~19 km |
| Alliant SBD 9107 JBS USA | Oil | 11.4 MW | ~19 km |
| Grinnell College | Solar | 3.9 MW | ~22 km |
| State Center | Oil | 6.3 MW | ~24 km |
| Venus Wind 3 LLC | Wind | 3 MW | ~27 km |
See all wind plants in Iowa or browse all plants in Iowa.