Ledyard Windpower, LLC
A 207 MW wind power plant in Kossuth, Iowa, owned by Duke Energy Renewables Services, commissioned in 2022.
Facility nameplate · EIA Plant ID 65390Wind
Nameplate capacity
207 MW
Primary fuel
Wind
Commissioned
2022
Time in queue (2017→2022)
5.3 yrs
Owner
Duke Energy Renewables Services
Location
Kossuth, Iowa
Coordinates
Generation (2024)
790.7 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1
This facility was matched to a MISO interconnection request (LBNL Queued Up): queued 2017, commercial operation 2022 — 5.3 years in the queue. See the MISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2022 | 62.2 | |
| 2023 | 666.5 | |
| 2024 | 790.7 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Lakota Wind Wind Farm | Wind | 10.5 MW | ~6 km |
| Golden Plains | Wind | 199.8 MW | ~7 km |
| Bancroft | Oil | 4.2 MW | ~18 km |
| Big Blue | Wind | 36 MW | ~21 km |
| Crystal Lake 3 LLC | Wind | 66 MW | ~22 km |
| Blue Earth | Oil | 11 MW | ~23 km |