Lincoln WWTF Hybrid
A 4 MW solar power plant in Placer, California, owned by Lincoln Solar Star, LLC, commissioned in 2021.
Facility nameplate · EIA Plant ID 65382Solar
Nameplate capacity
4 MW
Primary fuel
Solar
Commissioned
2021
Owner
Lincoln Solar Star, LLC
Location
Placer, California
Coordinates
Generation (2024)
6.4 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2021 | 2.6 | |
| 2022 | 7.1 | |
| 2023 | 6.4 | |
| 2024 | 6.4 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Lincoln Landfill | Waste | 4.8 MW | ~2 km |
| Rio Bravo Rocklin | Biomass | 27.9 MW | ~4 km |
| Roseville Power Plant #2 | Natural Gas | 66 MW | ~6 km |
| Sierra Pacific Lincoln Facility | Biomass | 19.2 MW | ~6 km |
| Roseville Energy Park | Natural Gas | 225 MW | ~8 km |
| Wildflower Solar 1 | Solar | 13 MW | ~21 km |
See all solar plants in California or browse all plants in California.