Lucky Peak Power Plant Project
A 101.2 MW hydroelectric power plant in Ada, Idaho, owned by Boise-Kuna Irrigation District, commissioned in 1988.
Facility nameplate · EIA Plant ID 10014Hydroelectric
Nameplate capacity
101.2 MW
Primary fuel
Hydroelectric
Commissioned
1988
Location
Ada, Idaho
Coordinates
Generation (2024)
290.6 GWh
Status
Operating
Technology
Conventional Hydroelectric
Units
3
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 277.9 | |
| 2016 | 340.3 | |
| 2017 | 463.3 | |
| 2018 | 347.6 | |
| 2019 | 363.9 | |
| 2020 | 254.4 | |
| 2021 | 221.7 | |
| 2022 | 233.7 | |
| 2023 | 331.8 | |
| 2024 | 290.6 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Boise R Diversion | Hydroelectric | 3.3 MW | ~3 km |
| Barber Dam | Hydroelectric | 4.1 MW | ~6 km |
| Arrowrock Hydroelectric Project | Hydroelectric | 15 MW | ~13 km |
| Orchard Ranch Solar | Solar | 20 MW | ~19 km |
| ID Solar | Solar | 40 MW | ~24 km |
| MC6 Hydro Facility | Hydroelectric | 2.3 MW | ~24 km |
See all hydroelectric plants in Idaho or browse all plants in Idaho.