A 49.5 MW solar power plant in Lowndes, Georgia, owned by Georgia Power Co, commissioned in 2020.

Facility nameplate · EIA Plant ID 62377Solar
Nameplate capacity
49.5 MW
Primary fuel
Solar
Commissioned
2020
Owner
Georgia Power Co
Location
Lowndes, Georgia
Generation (2024)
68 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Reported annual generation

YearGWh
202053.2
202194.6
202298.8
202394
202468