Mustang Two

A 150 MW solar power plant in Kings, California, owned by RE Mustang Two LLC, commissioned in 2020.

Facility nameplate · EIA Plant ID 62015Solar
Nameplate capacity
150 MW
Primary fuel
Solar
Commissioned
2020
Time in queue (2014→2020)
6.6 yrs
Owner
RE Mustang Two LLC
Location
Kings, California
Generation (2024)
384.1 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
2

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2014, commercial operation 2020 — 6.6 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of Mustang Two

Kings, California · 36.2168, -119.8964

Reported annual generation

YearGWh
202042
2021394.1
2022359.1
2023381.4
2024384.1

Nearby power plants

PlantFuelCapacityDistance
RE Mustang LLCSolar175 MW~1 km
Westside Solar Power PV1Solar2 MW~1 km
Slate HybridSolar440.3 MW~1 km
RE Kent South, LLCSolar20 MW~1 km
AlmondSolar19.9 MW~1 km
Henrietta D Energy Storage LLCStorage10 MW~2 km

See all solar plants in California or browse all plants in California.