Nellis Solar PV II
A 15 MW solar power plant in Clark, Nevada, owned by Nevada Power Co, commissioned in 2015.
Facility nameplate · EIA Plant ID 59919Solar
Nameplate capacity
15 MW
Primary fuel
Solar
Commissioned
2015
Owner
Nevada Power Co
Location
Clark, Nevada
Coordinates
Generation (2024)
37.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 2.1 | |
| 2016 | 40.6 | |
| 2017 | 40.2 | |
| 2018 | 40.6 | |
| 2019 | 39.4 | |
| 2020 | 40.1 | |
| 2021 | 36.4 | |
| 2022 | 39.1 | |
| 2023 | 37.4 | |
| 2024 | 37.4 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| TJX Las Vegas | Solar | 1 MW | ~6 km |
| Nellis Air Force Base Solar Array | Solar | 13.2 MW | ~6 km |
| IGS VGT | Solar | 1 MW | ~7 km |
| Las Vegas Generating Station | Natural Gas | 358.9 MW | ~7 km |
| Sun Peak Generating Station | Natural Gas | 222 MW | ~8 km |
| Las Vegas WPCF Solar Plant | Solar | 3.3 MW | ~8 km |
See all solar plants in Nevada or browse all plants in Nevada.