North Star Solar

A 61.6 MW solar power plant in Fresno, California, owned by Southern Power Co, commissioned in 2015.

Facility nameplate · EIA Plant ID 58713Solar
Nameplate capacity
61.6 MW
Primary fuel
Solar
Commissioned
2015
Time in queue (20102015)
5.4 yrs
Owner
Southern Power Co
Location
Fresno, California
Coordinates
Generation (2024)
132.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2015 5.4 years in the queue. See the CAISO queue or typical durations.

Reported annual generation

YearGWh
201582.7
2016149.6
2017157.1
2018155.6
2019149.7
2020142.8
2021131.4
2022140.5
2023135.9
2024132.4

Nearby power plants

PlantFuelCapacityDistance
Little Bear 4Solar50 MW~2 km
Little Bear 5Solar50 MW~2 km
Little Bear Solar 1, LLCSolar40 MW~2 km
Little Bear 3Solar20 MW~2 km
Citizen BSolar5 MW~2 km
Covanta MendotaBiomass28 MW~5 km

See all solar plants in California or browse all plants in California.