Oberon II Solar Project

A 375 MW solar power plant in Riverside, California, owned by IP Oberon II, LLC, commissioned in 2023.

Facility nameplate · EIA Plant ID 65735Solar
Nameplate capacity
375 MW
Primary fuel
Solar
Commissioned
2023
Owner
IP Oberon II, LLC
Location
Riverside, California
Generation (2024)
554.4 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2

Reported annual generation

YearGWh
2023164.3
2024554.4

Nearby power plants

PlantFuelCapacityDistance
Oberon Solar ProjectSolar375 MW~0 km
Maverick Solar 6, LLCSolar150 MW~3 km
Maverick Solar 7, LLCSolar132 MW~3 km
Maverick Solar, LLCSolar125 MW~3 km
Maverick Solar 4, LLCSolar100 MW~3 km
Athos Solar ProjectSolar250 MW~4 km

See all solar plants in California or browse all plants in California.