Platt Hill

A 2 MW solar power plant in Litchfield, Connecticut, owned by LSE Pictor LLC, commissioned in 2022.

Facility nameplate · EIA Plant ID 67423Solar
Nameplate capacity
2 MW
Primary fuel
Solar
Commissioned
2022
Owner
LSE Pictor LLC
Location
Litchfield, Connecticut
Generation (2024)
2.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Reported annual generation

YearGWh
20233.7
20242.4

Nearby power plants

PlantFuelCapacityDistance
Wind Colebrook SouthWind5 MW~7 km
Torrington Solar One, LLCSolar2 MW~8 km
Norfolk Landfill Solar ProjectSolar4 MW~10 km
Canis Minor Solar FarmSolar1 MW~10 km
Franklin DriveOil21.8 MW~11 km
Goodwin HydroelectricHydroelectric3.2 MW~12 km

See all solar plants in Connecticut or browse all plants in Connecticut.