Ponderosa Wind II

A 100 MW wind power plant in Beaver, Oklahoma, owned by Ponderosa Wind II, LLC, commissioned in 2024.

Facility nameplate · EIA Plant ID 66155Wind
Nameplate capacity
100 MW
Primary fuel
Wind
Commissioned
2024
Time in queue (2017→2024)
7.6 yrs
Owner
Ponderosa Wind II, LLC
Location
Beaver, Oklahoma
Generation (2024)
51.7 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1

This facility was matched to a SPP interconnection request (LBNL Queued Up): queued 2017, commercial operation 2024 — 7.6 years in the queue. See the SPP queue or typical durations.

Location

Map of the United States showing the location of Ponderosa Wind II

Beaver, Oklahoma · 36.5895, -100.8037

Nearby power plants

PlantFuelCapacityDistance
Balko Wind LLCWind299.7 MW~9 km
Ponderosa Wind Energy CenterWind200 MW~13 km
BluestemWind198 MW~20 km
Palo Duro WindWind249.9 MW~42 km
Tri County - TenKSolar1 MW~46 km
Great Plains Windpark LLCWind114 MW~53 km