Quinto Solar PV Project
A 108 MW solar power plant in Merced, California, owned by Arevon Energy, Inc., commissioned in 2015.
Facility nameplate · EIA Plant ID 59339Solar
Nameplate capacity
108 MW
Primary fuel
Solar
Commissioned
2015
Time in queue (2010→2015)
5.8 yrs
Owner
Arevon Energy, Inc.
Location
Merced, California
Coordinates
Generation (2024)
257 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2015 — 5.8 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 25.9 | |
| 2016 | 281 | |
| 2017 | 280.1 | |
| 2018 | 283.8 | |
| 2019 | 258.8 | |
| 2020 | 266.1 | |
| 2021 | 275.2 | |
| 2022 | 281.9 | |
| 2023 | 213.5 | |
| 2024 | 257 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| ONeill | Hydroelectric | 25.2 MW | ~4 km |
| W R Gianelli | Hydroelectric | 424 MW | ~7 km |
| Central 40 | Solar | 40 MW | ~14 km |
| Dinosaur Point | Wind | 17.4 MW | ~14 km |
| Wright Solar Park | Solar | 200 MW | ~16 km |
| Merced 1 PV | Solar | 3 MW | ~22 km |