Quinto Solar PV Project

A 108 MW solar power plant in Merced, California, owned by Arevon Energy, Inc., commissioned in 2015.

Facility nameplate · EIA Plant ID 59339Solar
Nameplate capacity
108 MW
Primary fuel
Solar
Commissioned
2015
Time in queue (2010→2015)
5.8 yrs
Location
Merced, California
Generation (2024)
257 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2015 — 5.8 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of Quinto Solar PV Project

Merced, California · 37.1303, -121.0522

Reported annual generation

YearGWh
201525.9
2016281
2017280.1
2018283.8
2019258.8
2020266.1
2021275.2
2022281.9
2023213.5
2024257

Nearby power plants

PlantFuelCapacityDistance
ONeillHydroelectric25.2 MW~4 km
W R GianelliHydroelectric424 MW~7 km
Central 40Solar40 MW~14 km
Dinosaur PointWind17.4 MW~14 km
Wright Solar ParkSolar200 MW~16 km
Merced 1 PVSolar3 MW~22 km

See all solar plants in California or browse all plants in California.