Randall Solar Project Hybrid

A 8.3 MW solar power plant in Worcester, Massachusetts, owned by AES Distributed Energy, commissioned in 2021.

Facility nameplate · EIA Plant ID 63475Solar
Nameplate capacity
8.3 MW
Primary fuel
Solar
Commissioned
2021
Owner
AES Distributed Energy
Location
Worcester, Massachusetts
Generation (2024)
7.9 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2

Reported annual generation

YearGWh
20211.9
20226.3
20238.7
20247.9

Nearby power plants

PlantFuelCapacityDistance
Cosgrove Intake and Power StationHydroelectric3.2 MW~3 km
Syncarpha Still River, LLC CSGSolar2 MW~4 km
Bolton PVSolar4.9 MW~7 km
CES Sterling LLCSolar2 MW~7 km
Cherry StreetNatural Gas17.3 MW~8 km
Chocksett Rd Energy Storage ProjectStorage2 MW~9 km