San Joaquin Solar
A 21.3 MW solar power plant in Fresno, California, owned by GASNA 6P, LLC, commissioned in 2018.
Facility nameplate · EIA Plant ID 60678Solar
Nameplate capacity
21.3 MW
Primary fuel
Solar
Commissioned
2018
Owner
GASNA 6P, LLC
Location
Fresno, California
Coordinates
Generation (2024)
24.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
2
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2018 | 11.3 | |
| 2019 | 38.9 | |
| 2020 | 41.1 | |
| 2021 | 28.3 | |
| 2022 | 31.4 | |
| 2023 | 37.2 | |
| 2024 | 24.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Stroud Solar Station | Solar | 20 MW | ~4 km |
| Van der Hoek Solar Array/ Dairy | Solar | 2.4 MW | ~5 km |
| Fresno Solar | Solar | 3 MW | ~11 km |
| Fresno Cogen Partners | Natural Gas | 86.8 MW | ~11 km |
| Crystal Farms Local Solar | Solar | 3.5 MW | ~12 km |
| Open Sky Ranch Inc | Solar | 1.7 MW | ~13 km |