A 200 MW solar power plant in Kern, California, owned by EDPR CA Solar Park LLC, commissioned in 2024.

Facility nameplate · EIA Plant ID 65663Solar
Nameplate capacity
200 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2015→2024)
9.3 yrs
Owner
EDPR CA Solar Park LLC
Location
Generation (2024)
42.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO West interconnection request (LBNL Queued Up): queued 2015, commercial operation 2024 — 9.3 years in the queue. See the West queue or typical durations.

Location

Map of the United States showing the location of Sandrini Solar 200

Kern, California · 35.1026, -119.0541

Nearby power plants

PlantFuelCapacityDistance
Lakeview Battery Storage FacilityStorage1.2 MW~1 km
Sandrini Solar 100Solar100 MW~5 km
ABEC Bidart-Old River LLCBiomass2 MW~9 km
Adobe SolarSolar20 MW~9 km
ABEC #4 dba CE&S DairyBiomass1 MW~10 km
AVI BakersfieldSolar2.2 MW~12 km

See all solar plants in California or browse all plants in California.