Superior Landfill Gas Recovery
A 6.4 MW waste power plant in Chatham, Georgia, owned by WM Renewable Energy LLC, commissioned in 2009.
Facility nameplate · EIA Plant ID 57026Waste
Nameplate capacity
6.4 MW
Primary fuel
Waste
Commissioned
2009
Location
Chatham, Georgia
Coordinates
Generation (2024)
50 GWh
Status
Operating
Technology
Landfill Gas
Units
8
Location
Chatham, Georgia · 32.0303, -81.2722
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 44.3 | |
| 2016 | 38.3 | |
| 2017 | 42.1 | |
| 2018 | 44.2 | |
| 2019 | 38.3 | |
| 2020 | 47.3 | |
| 2021 | 47.4 | |
| 2022 | 44.8 | |
| 2023 | 46.9 | |
| 2024 | 50 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| International Paper Savanna Mill | Biomass | 154 MW | ~16 km |
| Imperial Savannah LP | Natural Gas | 11.7 MW | ~17 km |
| Port Wentworth Mill | Biomass | 72.3 MW | ~18 km |
| IKEA Savannah 490 | Solar | 2.2 MW | ~19 km |
| Bobby C Smith Jr Energy Facility | Natural Gas | 596.6 MW | ~27 km |
| Rincon Solar I | Solar | 18.4 MW | ~29 km |
See all waste plants in Georgia or browse all plants in Georgia.