Swift Air Solar I

A 145 MW solar power plant under construction in Ector, Texas, owned by Origis Energy USA, Inc, expected online 2025.

Facility nameplate · EIA Plant ID 68537Under constructionSolar
Nameplate capacity
145 MW
Primary fuel
Solar
Commissioned
Location
Ector, Texas
Status
Under construction
Expected online
2025
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Swift Air Solar I

Ector, Texas · 31.7688, -102.696

Nearby power plants

PlantFuelCapacityDistance
Oberon IASolar150 MW~7 km
Oberon IBSolar30 MW~8 km
Judkins BESSStorage9.9 MW~11 km
Phoebe SolarSolar250 MW~18 km
GoldsmithOil9 MW~24 km
WestoverOil9 MW~25 km