Tejon Castac Water District Solar

A 1.3 MW solar power plant in Kern, California, owned by CTMW Solar, LLC, commissioned in 2024.

Facility nameplate · EIA Plant ID 67365Solar
Nameplate capacity
1.3 MW
Primary fuel
Solar
Commissioned
2024
Owner
CTMW Solar, LLC
Location
Generation (2024)
2.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Nearby power plants

PlantFuelCapacityDistance
Blue Skies Solar, LLCSolar1 MW~2 km
Wheeler Ridge 2Solar5 MW~2 km
IKEA Tejon 345Solar1.5 MW~5 km
Pastoria Energy Facility, LLCNatural Gas779 MW~7 km
AVI BakersfieldSolar2.2 MW~9 km
Adobe SolarSolar20 MW~12 km

See all solar plants in California or browse all plants in California.