Turquoise Liberty Solar
A 10 MW solar power plant in Washoe, Nevada, owned by Liberty Utilities (CalPeco Electric) LLC, commissioned in 2019.
Facility nameplate · EIA Plant ID 62980Solar
Nameplate capacity
10 MW
Primary fuel
Solar
Commissioned
2019
Owner
Liberty Utilities (CalPeco Electric) LLC
Location
Washoe, Nevada
Coordinates
Generation (2024)
9.2 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2019 | 1.3 | |
| 2020 | 16.2 | |
| 2021 | 22.2 | |
| 2022 | 24.5 | |
| 2023 | 14.8 | |
| 2024 | 9.2 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Turquoise Nevada, LLC | Solar | 60 MW | ~2 km |
| Tracy | Natural Gas | 1.03 GW | ~3 km |
| Western 102 Power Plant | Natural Gas | 118.6 MW | ~3 km |
| Chukar Battery Energy Storage System | Storage | 10 MW | ~8 km |
| Tesla Reno GigaFactory | Solar | 6.7 MW | ~9 km |
| Waste Management Lockwood LFGTE | Waste | 3.2 MW | ~14 km |