Turquoise Liberty Solar
A 10 MW solar power plant in Washoe, Nevada, owned by Liberty Utilities (CalPeco Electric) LLC, commissioned in 2019.
Facility nameplate · EIA Plant ID 62980Solar
Nameplate capacity
10 MW
Primary fuel
Solar
Commissioned
2019
Location
Washoe, Nevada
Coordinates
Generation (2024)
9.2 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Location
Washoe, Nevada · 39.59, -119.52
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2019 | 1.3 | |
| 2020 | 16.2 | |
| 2021 | 22.2 | |
| 2022 | 24.5 | |
| 2023 | 14.8 | |
| 2024 | 9.2 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Turquoise Nevada, LLC | Solar | 60 MW | ~2 km |
| Tracy | Natural Gas | 1.03 GW | ~3 km |
| Western 102 Power Plant | Natural Gas | 118.6 MW | ~3 km |
| Chukar Battery Energy Storage System | Storage | 10 MW | ~8 km |
| Tesla Reno GigaFactory | Solar | 6.7 MW | ~9 km |
| Waste Management Lockwood LFGTE | Waste | 3.2 MW | ~14 km |
See all solar plants in Nevada or browse all plants in Nevada.