Walmart Casa Grande

A 2 MW solar power plant in Pinal, Arizona, owned by Tesla Inc., commissioned in 2011, retired in 2023.

Facility nameplate · EIA Plant ID 57939Retired 2023Solar
Nameplate capacity
2 MW
Primary fuel
Solar
Commissioned
2011
Owner
Tesla Inc.
Location
Pinal, Arizona
Generation (2023)
1.8 GWh
Status
Retired
Retired
2023
Technology
Solar Photovoltaic
Units
2

Reported annual generation

YearGWh
20153.2
20163.2
20173
20181.4
20192.6
20202.2
20212.2
20222.4
20231.8

Nearby power plants

PlantFuelCapacityDistance
Desert BasinNatural Gas745.1 MW~4 km
Vista Grande HS at Casa GrandeSolar1.4 MW~6 km
Union HS at Casa GrandeSolar1.6 MW~8 km
Eleven Mile Solar CenterSolar600 MW~17 km
SundanceNatural Gas605 MW~18 km
Central Line Solar, LLCSolar100 MW~19 km