Wever Solar (150MW)
A 150 MW solar power plant in Lee, Iowa, owned by Interstate Power and Light Co, commissioned in 2024.
Facility nameplate · EIA Plant ID 67538Solar
Nameplate capacity
150 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2020→2024)
4 yrs
Owner
Interstate Power and Light Co
Location
Lee, Iowa
Coordinates
Generation (2024)
17.1 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a MISO interconnection request (LBNL Queued Up): queued 2020, commercial operation 2024 — 4 years in the queue. See the MISO queue or typical durations.
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Burlington (IA) | Natural Gas | 290.8 MW | ~13 km |
| NLMU Diesel | Oil | 8 MW | ~24 km |
| NLMU Wind | Wind | 1.5 MW | ~26 km |
| Galesburg Solar Array | Solar | 1.4 MW | ~34 km |
| Mt Pleasant | Oil | 24 MW | ~35 km |
| Keokuk | Hydroelectric | 124.8 MW | ~38 km |