Florida · Battery
Proposed battery projects in Florida
There are 10 proposed battery projects in Florida's interconnection queue, totaling 1.77 GW of requested capacity. The largest is FPL project at 400 MW, and the median planned online year is 2027.
10
Proposed projects
1.77 GW
Requested capacity
176.8 MW
Average project size
2027
Median planned online year
All proposed battery projects in Florida
| Type | ||||
|---|---|---|---|---|
| FPL project 620 | Battery | 400 MW | 2024 | 2026 |
| Duke Energy Florida, LLC project 292 | Battery | 225 MW | 2021 | 2025 |
| Malta Project 202311 | Battery | 225 MW | 2023 | 2026 |
| FPL project 615 | Battery | 200 MW | 2024 | 2027 |
| Duke Energy Florida, LLC project FC100009 | Battery | 199 MW | 2024 | 2029 |
| Duke Energy Florida, LLC project FC100380 | Battery | 199 MW | 2025 | 2030 |
| Duke Energy Florida, LLC project 327 | Battery | 100 MW | 2023 | 2027 |
| Duke Energy Florida, LLC project FC100008 | Battery | 100 MW | 2024 | 2029 |
| Duke Energy Florida, LLC project FC100381 | Battery | 100 MW | 2025 | 2031 |
| Queue 120 120 | Battery | 20 MW | 2025 | 2027 |
Browse Florida's full interconnection queue. Compare with operating capacity: 7 operating storage plants in Florida. Nationwide: Storage plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).