Proposed gas projects in Florida

There are 14 proposed gas projects in Florida's interconnection queue, totaling 3.60 GW of requested capacity. The largest is Queue JEA-Q008 at 645 MW, and the median planned online year is 2026.

14
Proposed projects
3.60 GW
Requested capacity
257.2 MW
Average project size
2026
Median planned online year

All proposed gas projects in Florida

TypeRegionIA Status
Queue JEA-Q008
JEA-Q008
GasSoutheastDuvalFeasibility Study645 MW20182030
Seminole Electric Cooperative, Inc. project
137
GasSoutheastPascoConstruction575 MW20152020
Bull Creek (Osceola Generating Station)
202110
GasSoutheastOsceolaIA Executed555 MW20212025
Orlando Utilities Commission project
4
GasSoutheastOsceolaIn Progress (unknown study)537 MW1999
Duke Energy Florida, LLC project
FC100382
GasSoutheastOsceolaIn Progress (unknown study)265 MW20252030
Duke Energy Florida, LLC project
FC100386
GasSoutheastOsceolaIn Progress (unknown study)265 MW20252030
Duke Energy Florida, LLC project
328
GasSoutheastPinellasConstruction172 MW20232024
Queue 22
22
GasSoutheastSystem Impact Study136 MW20182019
Queue 118
118
GasSoutheastPolkCluster Study132 MW20252026
FPL project
415
GasSoutheastManateeFacility Study87 MW20202026
Duke Energy Florida, LLC project
333
GasSoutheastPolkConstruction84 MW20232025
FPL project
417
GasSoutheastVolusiaFacility Study76 MW20202025
FPL project
419
GasSoutheastMartinFacility Study60 MW20202026
Masked project
FC100379
GasSoutheastOrangeIn Progress (unknown study)12 MW20252026

Browse Florida's full interconnection queue. Compare with operating capacity: 67 operating natural gas plants in Florida. Nationwide: Natural Gas plants nationwide.

Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).