Louisiana · Gas
Proposed gas projects in Louisiana
There are 18 proposed gas projects in Louisiana's interconnection queue, totaling 15.98 GW of requested capacity. The largest is Franklin Farms at 1.64 GW, and the median planned online year is 2028.
18
Proposed projects
15.98 GW
Requested capacity
887.7 MW
Average project size
2028
Median planned online year
All proposed gas projects in Louisiana
| Type | ||||
|---|---|---|---|---|
| Franklin Farms E0014 | Gas | 1.64 GW | 2025 | 2028 |
| Richland Parish generators E0043 | Gas | 1.64 GW | 2025 | 2028 |
| Richland Parish generators E0044 | Gas | 1.64 GW | 2025 | 2028 |
| Queue J4071 J4071 | Gas | 1.50 GW | 2025 | 2030 |
| Queue GEN-2024-379 GEN-2024-379 | Gas | 1.35 GW | 2025 | 2031 |
| Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem R1048 | Gas | 1.23 GW | 2024 | 2025 |
| Queue J4138 J4138 | Gas | 805 MW | 2025 | 2030 |
| Queue J4191 J4191 | Gas | 805 MW | 2025 | 2030 |
| Cleco Power LLC project E0048 | Gas | 775 MW | 2025 | 2028 |
| Entergy Louisiana LRZ 9 Generation Resource E0045 | Gas | 770 MW | 2025 | 2028 |
| Queue J4133 J4133 | Gas | 756 MW | 2025 | 2030 |
| Queue J1246 J1246 | Gas | 725.2 MW | 2019 | 2025 |
| Queue J4190 J4190 | Gas | 707 MW | 2025 | 2030 |
| Waterford 5 E0029 | Gas | 478 MW | 2025 | 2028 |
| Queue J4110 J4110 | Gas | 400 MW | 2025 | 2030 |
| Point Coupee E0051 | Gas | 377 MW | 2025 | 2028 |
| Queue J2791 J2791 | Gas | 262.7 MW | 2022 | 2027 |
| Queue J1833 J1833 | Gas | 115.1 MW | 2021 | 2025 |
Browse Louisiana's full interconnection queue. Compare with operating capacity: 50 operating natural gas plants in Louisiana. Nationwide: Natural Gas plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).