South Dakota · Gas
Proposed gas projects in South Dakota
There are 7 proposed gas projects in South Dakota's interconnection queue, totaling 1.67 GW of requested capacity. The largest is Queue J3941 at 1.14 GW, and the median planned online year is 2026.
7
Proposed projects
1.67 GW
Requested capacity
238.5 MW
Average project size
2026
Median planned online year
All proposed gas projects in South Dakota
| Type | ||||
|---|---|---|---|---|
| Queue J3941 J3941 | Gas | 1.14 GW | 2025 | 2030 |
| Basin Electric Power Cooperative project E0034 | Gas | 265 MW | 2025 | 2027 |
| Queue ERAS-2025-035 ERAS-2025-035 | Gas | 138 MW | 2025 | 2029 |
| Black Hills Power Inc. project BHBE G25 | Gas | 115 MW | 2024 | 2026 |
| Queue 456 456 | Gas | 5 MW | 2024 | 2025 |
| Queue 462 462 | Gas | 2 MW | 2024 | 2025 |
| Queue 463 463 | Gas | 0.5 MW | 2024 | 2025 |
Browse South Dakota's full interconnection queue. Compare with operating capacity: 11 operating natural gas plants in South Dakota. Nationwide: Natural Gas plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).