Montana · Hydroelectric
Hydroelectric power plants in Montana
There are 23 hydroelectric plants in Montana in this directory, with a combined nameplate capacity of 2.68 GW. The largest is Libby at 525 MW.
23
Plants
2.68 GW
Combined capacity
116.6 MW
Average plant size
1958
Avg. commissioning year
| Plant | Fuel | Capacity |
|---|---|---|
| Libby | Hydroelectric | 525 MW |
| Noxon Rapids | Hydroelectric | 487.8 MW |
| Hungry Horse | Hydroelectric | 428 MW |
| Yellowtail | Hydroelectric | 278.2 MW |
| Selis Ksanka Qlispe | Hydroelectric | 227.8 MW |
| Fort Peck | Hydroelectric | 179.7 MW |
| Thompson Falls | Hydroelectric | 98.1 MW |
| Morony | Hydroelectric | 63 MW |
| Cochrane | Hydroelectric | 60.4 MW |
| Rainbow (MT) | Hydroelectric | 59 MW |
| Ryan | Hydroelectric | 55.2 MW |
| Canyon Ferry | Hydroelectric | 55 MW |
| Holter | Hydroelectric | 54.6 MW |
| Black Eagle | Hydroelectric | 26.7 MW |
| Madison Dam | Hydroelectric | 16.4 MW |
| Hauser | Hydroelectric | 16.3 MW |
| Turnbull Hydro | Hydroelectric | 13 MW |
| Mystic | Hydroelectric | 12 MW |
| Broadwater Power Project | Hydroelectric | 9.7 MW |
| Tiber Dam Hydroelectric Plant | Hydroelectric | 7.5 MW |
| Big Fork | Hydroelectric | 4.1 MW |
| Flint Creek Hydroelectric LLC | Hydroelectric | 2 MW |
| South Dry Creek Hydro | Hydroelectric | 2 MW |