City of Holyoke Gas and Electric Dept. owns or operates 7 generating facilities commissioned between 1893 and 1982, with a combined nameplate capacity of 83.9 MW. The largest share of capacity is hydroelectric (100%), located in Massachusetts.
Ownership reflects the utility or operator reported to EIA (Form EIA-860); equity ownership of individual facilities may differ.
7
Plants
83.9 MW
Total capacity
1
States
33.4 MW
Largest: Hadley Falls
Capacity mix
Hydroelectric 100.0%
Operating plants
| Plant | Fuel | Capacity |
|---|---|---|
| Hadley Falls | Hydroelectric | 33.4 MW |
| Cobble Mountain | Hydroelectric | 33 MW |
| Riverside Holyoke | Hydroelectric | 6.9 MW |
| Boatlock | Hydroelectric | 3.1 MW |
| Cabot Holyoke | Hydroelectric | 2.6 MW |
| Chemical | Hydroelectric | 1.6 MW |
Retired plants (1)
| Plant | Fuel | Capacity |
|---|---|---|
| Harris Energy Realtyretired 2019 | Hydroelectric | 3.3 MW |