Boatlock

A 3.1 MW hydroelectric power plant in Hampden, Massachusetts, owned by City of Holyoke Gas and Electric Dept., commissioned in 1921.

Facility nameplate · EIA Plant ID 1603Hydroelectric
Nameplate capacity
3.1 MW
Primary fuel
Hydroelectric
Commissioned
1921
Location
Hampden, Massachusetts
Generation (2024)
18.9 GWh
Status
Operating
Technology
Conventional Hydroelectric
Units
3

Location

Map of the United States showing the location of Boatlock

Hampden, Massachusetts · 42.2086, -72.6014

Reported annual generation

YearGWh
201514.9
201611.2
201715.3
201816.5
201915.4
202014.5
202113.1
202210.6
202321.3
202418.9

Nearby power plants

PlantFuelCapacityDistance
Hadley FallsHydroelectric33.4 MW~0 km
Riverside HolyokeHydroelectric6.9 MW~1 km
Cabot HolyokeHydroelectric2.6 MW~1 km
ChemicalHydroelectric1.6 MW~2 km
Chicopee SolarSolar3 MW~3 km
CED Chicopee SolarSolar3 MW~4 km

See all hydroelectric plants in Massachusetts or browse all plants in Massachusetts.