Altavista Solar
A 80 MW solar power plant in Campbell, Virginia, owned by Altavista Solar, LLC, commissioned in 2021.
Facility nameplate · EIA Plant ID 64019Solar
Nameplate capacity
80 MW
Primary fuel
Solar
Commissioned
2021
Time in queue (2016→2020)
4 yrs
Owner
Altavista Solar, LLC
Location
Campbell, Virginia
Coordinates
Generation (2024)
162.3 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2016, commercial operation 2020 — 4 years in the queue. See the PJM queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2021 | 136.6 | |
| 2022 | 167.7 | |
| 2023 | 168.9 | |
| 2024 | 162.3 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Altavista Power Station | Biomass | 71.1 MW | ~7 km |
| Leesville | Hydroelectric | 40 MW | ~8 km |
| HCE Roark Mill Solar, LLC | Solar | 3.2 MW | ~11 km |
| Smith Mountain | Hydroelectric | 547.5 MW | ~20 km |
| Bedford Solar (Oppidum) | Solar | 3 MW | ~24 km |
| Whitehorn Solar | Solar | 50 MW | ~24 km |
See all solar plants in Virginia or browse all plants in Virginia.