BPL Crown Solar LLC
A 100 MW solar power plant in Falls, Texas, owned by BPL Crown Solar LLC, commissioned in 2024.
Facility nameplate · EIA Plant ID 64259Solar
Nameplate capacity
100 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2019→2024)
4.7 yrs
Owner
BPL Crown Solar LLC
Location
Falls, Texas
Coordinates
Generation (2024)
198.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a ERCOT interconnection request (LBNL Queued Up): queued 2019, commercial operation 2024 — 4.7 years in the queue. See the ERCOT queue or typical durations.
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| BPL Sol Solar LLC | Solar | 100 MW | ~0 km |
| Griffin Solar | Solar | 5 MW | ~15 km |
| Eddy II | Solar | 10 MW | ~18 km |
| Sandy Creek Energy Station | Coal | 1.01 GW | ~19 km |
| AbbVie Waco | Natural Gas | 5.6 MW | ~19 km |
| Marlin Solar | Solar | 5.3 MW | ~21 km |
See all solar plants in Texas or browse all plants in Texas.