Interconnection region
ERCOT interconnection queue
1,982 proposed projects — 1,792 active and 190 suspended — are in the ERCOT queue, totaling 447.43 GW of requested capacity. Projects that reached commercial operation here took a median of 3.7 years from interconnection request to online date (470 completed projects).
1,982
Proposed projects
447.43 GW
Requested capacity
Battery
Largest resource type
3.7 yrs
Median request → operation
Requested capacity by resource type
Battery 29.8%Solar + Battery 25.0%Solar 21.6%Wind 12.6%Gas 10.2%Other 0.7%Hydro 0.1%
By state in ERCOT
Largest proposed projects in ERCOT
| Type | ||||
|---|---|---|---|---|
| Prairie Ridge (Gas - CC) 30INR0071 | Gas | 1.66 GW | 2025 | 2032 |
| Hecate Energy Orem Wind 27INR0061 | Wind | 1.54 GW | 2023 | 2030 |
| Aegle Power 27INR0084 | Gas | 1.54 GW | 2024 | 2027 |
| Big Canyon Wind 30INR0018 | Wind | 1.50 GW | 2025 | 2031 |
| Caldwell County Energy Center 30INR0031 | Gas | 1.50 GW | 2025 | 2030 |
| Mule Deer Run Gas 32INR0003 | Gas | 1.38 GW | 2025 | 2032 |
| BasRanch (TEF - Due Diligence) 25INR0008 | Gas | 1.35 GW | 2020 | 2028 |
| Sandow Lakes Energy Station 27INR0071 | Gas | 1.29 GW | 2024 | 2028 |
| Jewett Energy Center 1 Gas 29INR0150 | Gas | 1.27 GW | 2025 | 2029 |
| Tolar Energy Center 29INR0180 | Gas | 1.25 GW | 2025 | 2029 |
| Limitless Energy Hub I 27INR0581 | Gas | 1.24 GW | 2025 | 2028 |
| Limitless Energy Hub II 27INR0582 | Gas | 1.24 GW | 2025 | 2028 |
| Southeast Oklahoma Pumped Storage 30INR0002 | Other | 1.23 GW | 2022 | 2030 |
| Wolf Bone North Energy Center 29INR0162 | Gas | 1.20 GW | 2025 | 2029 |
| Corvette Windsusp. 28INR0033 | Wind | 1.20 GW | 2024 | — |
| Spectra Solar 28INR0486 | Solar | 1.20 GW | 2025 | 2028 |
| Eagle Pines Gas 18INR0009 | Gas | 1.17 GW | 2015 | 2028 |
| Aurelius Solar 29INR0003 | Solar | 1.12 GW | 2023 | 2028 |
| Bastrop Peaking Generators (TEF-Due Diligence) 26INR0261 | Gas | 1.10 GW | 2024 | 2027 |
| Zeus Armstrong BESS 25INR0587 | Solar + Battery | 1.04 GW | 2024 | 2028 |
| Zeus Scurry BESS 27INR0535 | Solar + Battery | 1.04 GW | 2025 | 2028 |
| Zeus Mitchell BESS 25INR0589 | Solar + Battery | 1.04 GW | 2024 | 2029 |
| Zeus Mitchell BESS II 26INR0686 | Solar + Battery | 1.04 GW | 2025 | 2027 |
| EmberGreen 28INR0090 | Gas | 1.04 GW | 2024 | 2028 |
| Hecate Energy Arkansas Wind 30INR0004 | Wind | 1.03 GW | 2023 | 2030 |
| Hecate Energy Jamaica Wind 30INR0003 | Wind | 1.03 GW | 2023 | 2030 |
| Kickstart Energy Storage VI 29INR0218 | Battery | 1.03 GW | 2025 | 2029 |
| Ross Solar 26INR0155 | Solar + Battery | 1.03 GW | 2023 | 2027 |
| Pumpville Ranch 1susp. 25INR0398 | Solar | 1.00 GW | — | — |
| Kickstart Energy Storage V 29INR0217 | Battery | 999 MW | 2025 | 2029 |
| Black Mountain Hale Gas 29INR0175 | Gas | 990.6 MW | 2025 | 2029 |
| Zeus Spade Wind 26INR0386 | Wind | 987.3 MW | 2024 | 2027 |
| Complex Serenity Wind 28INR0215 | Wind | 971 MW | 2025 | 2029 |
| Kilby1 Part 4 Large Block Simple Cycle 28INR0459 | Gas | 950 MW | 2025 | 2028 |
| Riviera Gas 29INR0206 | Gas | 941.8 MW | 2025 | 2030 |
| EmberYork 28INR0089 | Gas | 900 MW | 2024 | 2028 |
| Fierce River Solar 27INR0221 | Solar + Battery | 895.7 MW | 2024 | 2029 |
| West Royal Natural Gas (TEF-Due Diligence) 28INR0086 | Gas | 888 MW | 2024 | 2030 |
| Lost Pines Power Park 30INR0052 | Gas | 880 MW | 2025 | 2030 |
| SCHNEIDER COMBINED CYCLE 30INR0054 | Gas | 880 MW | 2025 | 2030 |
| Sim Gideon Combined Cycle 30INR0051 | Gas | 880 MW | 2025 | 2030 |
| MilamStation Power Secured Gas Generation 29INR0120 | Gas | 846 MW | 2025 | 2029 |
| Shadow Ranch Solar 25INR0207 | Solar | 807.6 MW | 2022 | 2026 |
| Zeus Mitchell Solar 25INR0588 | Solar + Battery | 804.7 MW | 2024 | 2029 |
| Indigo Solar 3 28INR0067 | Solar | 800 MW | 2024 | 2028 |
| Blue Bird Solar 24INR0075 | Solar | 773 MW | 2021 | 2028 |
| Axis Ridge Wind 28INR0113 | Wind | 750 MW | 2024 | 2029 |
| Central Power Station 26INR0370 | Gas | 750 MW | 2024 | 2027 |
| Nabla Energy Storage I 27INR0571 | Battery | 750 MW | 2025 | 2028 |
| Nabla Energy Storage II 28INR0466 | Battery | 750 MW | 2025 | 2028 |
Showing the 50 largest of 1,982 projects by requested capacity.
Browse the national queue or read the queue insights.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).