Butler Solar Power Project
A 2.8 MW solar power plant in Bates, Missouri, owned by Missouri Jnt Muni.Pwr Elec. Ut. Comm., commissioned in 2014.
Facility nameplate · EIA Plant ID 58959Solar
Nameplate capacity
2.8 MW
Primary fuel
Solar
Commissioned
2014
Location
Bates, Missouri
Coordinates
Generation (2024)
4.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Location
Bates, Missouri · 38.27, -94.35
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 4.6 | |
| 2016 | 4.7 | |
| 2017 | 4.5 | |
| 2018 | 4.1 | |
| 2019 | 4.1 | |
| 2020 | 4.2 | |
| 2021 | 4.2 | |
| 2022 | 4.3 | |
| 2023 | 4.5 | |
| 2024 | 4.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Butler Municipal Power Plant | Oil | 10.9 MW | ~1 km |
| La Cygne | Coal | 1.60 GW | ~27 km |
| Nevada | Oil | 21.6 MW | ~47 km |
| South Harper | Natural Gas | 351 MW | ~47 km |
| El Dorado Springs Solar Farm | Solar | 2.5 MW | ~55 km |
| Osawatomie | Natural Gas | 102 MW | ~56 km |
See all solar plants in Missouri or browse all plants in Missouri.